St Therese School Gym

Aurora, Illinois

Desired Services
Accessibility & Code Compliance

Project Description

Council # 736 of the Knights of Columbus will supply the money to build a Basketball Gym for the elementary school at St Therese Church School in Aurora Illinois. We will be using a pre engineered metal building to be placed between two brick buildings.

The building footprint size is 70 x 120 (Main Building) and 30 x 74 (attached Lean-To)

We are in need of an architect that can create a site plan to be used to get zoning and permit approvals from the city of Aurora. Also a foundation plan for the building needs to be created.

We have the help of a construction supervisor which can do any soil testing that is required.

After approval by the city and diocese the prefabricated steel will be ordered and delivered to the job site.

Timeline
Deliverables in Phases:
1) Preliminary Building Design documents - 1 Month
Preliminary Site Plan
Preliminary Floor Plan
Color Site Plan and exterior elevations.

2)Site Drawings - 2 months
Building footprint location
Landscaping

3)Architectural Drawings - 3 Months
Building Shell
Interior Build Out

All the Following in 4 Months.
4)HVAC Drawings
5)Plumbing Drawings
6)Electrical Drawings
7)Structural Drawings
8)Fire Sprinkler Drawings

Erect and finish building - 5 months (Jjuly 2009)